21st August 2014
Read it.
Hear, hear.
This entry was posted on Thursday, August 21st, 2014 at 19:59 and is filed under Think about it..
You can follow any responses to this entry through the RSS 2.0 feed.
Both comments and pings are currently closed.
August 22nd, 2014 at 09:39
9/80 schedules (with every other Friday off) are pretty common in the chemical and petroleum industries – at least at the plant level. Corporate folks don’t usually get to do that because the Big Bosses like to have peons available to chew on at all times.