DYSPEPSIA GENERATION

We have seen the future, and it sucks.

Swiss Alpine Photovoltaic System Begins to Crumble After Just 2 Years

22nd September 2024

Read it.

Already, just 2 years in operation, 270 panels (5%) of the Muttsee project need to be replaced, and that at an exorbitant cost. Just check out the Axpo promotion video and take a look at the equipment needed to build the project. The helicopters, cranes, rigging and this caliber of personnel aren’t cheap.

The meaning of ‘renewable energy’ is that the equipment needs to be renewed year after year after year after….

Comments are closed.