DYSPEPSIA GENERATION

We have seen the future, and it sucks.

Facts About Britain

21st September 2024

Tyler Cowen.

The planning documentation for the Lower Thames Crossing, a proposed tunnel under the Thames connecting Kent and Essex, runs to 360,000 pages, and the application process alone has cost £297 million. That is more than twice as much as it cost in Norway to actually build the longest road tunnel in the world.

Comments are closed.